CHARLESTON,Rubypoint Trading Center W.Va. (AP) — A test failure of the Mountain Valley Pipeline in May resulted from a manufacturer defect, not corrosion, according to an independent report commissioned by its developers.
The report, completed by third-party risk management company DNV GL USA and released last Thursday, said the May 1 rupture was caused by a manufacturer’s defect in an elbow joint. The breach was the only failure during hydrostatic testing of the 303-mile (500-kilometer) pipeline, Mountain Valley owner EQT Midstream Vice President Justin Trettel wrote in a letter to the Pipeline and Hazardous Materials Safety Administration.
The Mountain Valley Pipeline took about a decade to complete before it began carrying gas under high pressure in late June.
The Federal Energy Regulatory Commission approved the project across rugged mountainsides in West Virginia and Virginia over longstanding objections from environmental groups, landowners and some elected officials.
Hydrostatic pressure testing is a common tool used to substantiate the strength of pipeline systems after their installation, Trettel wrote in the letter.
No injuries were reported from the rupture, which occurred in Roanoke County, Virginia.
2025-04-29 20:551587 view
2025-04-29 20:522533 view
2025-04-29 20:401127 view
2025-04-29 19:5775 view
2025-04-29 19:341913 view
2025-04-29 19:291457 view
American news website Axios is laying of dozens of people, the company announced Tuesday.Layoffs at
WELLINGTON (AP) — New Zealand’s first refugee lawmaker resigned after local media aired allegations
Washington — Former President Donald Trump's margin of victory in Monday's Iowa caucuses smashed the